The following video was taken while standing in the living room, panning from the deck, through the kitchen area, out the front door, past the corner fireplace, through the master bedroom wall, out to the view.
Showing posts with label video. Show all posts
Showing posts with label video. Show all posts
Tuesday, January 1, 2019
Roof! Roof! Roof!
Things are coming along very well. The framers are 99.9% complete and the plumber has started. Electrician will start in about a week.
The following video was taken while standing in the living room, panning from the deck, through the kitchen area, out the front door, past the corner fireplace, through the master bedroom wall, out to the view.
The following video was taken while standing in the living room, panning from the deck, through the kitchen area, out the front door, past the corner fireplace, through the master bedroom wall, out to the view.
Saturday, November 10, 2018
Framing has begun!
Wednesday, October 31, 2018
Concrete Complete
They poured the basement floor on the 22nd.
We ordered a colored concrete for the garage floor. That was poured the following Friday. Then they put the lot on final grade.
Wood should be delivered by the end of the week!
We ordered a colored concrete for the garage floor. That was poured the following Friday. Then they put the lot on final grade.
Wood should be delivered by the end of the week!
Tuesday, October 16, 2018
Some Progress
Well let's see, what's new since last I posted? They poured the lower level walls.
And sprayed them with water-proofing.
And did some preliminary grading.
Then the plumbers came and did the in-ground drain plumbing.
If all goes well the Inspector will pass the work and the concrete lower level floor will be poured this week. Then comes the framing!
So far we have been happy with the builder. Especially the foreman Matt. He keeps us up to date and very much in the loop. Has listened to our concerns and communicated well with the subs. My engineer husband really appreciates that :)
Sunday, September 2, 2018
Subscribe to:
Posts (Atom)
First Snow
It was pretty but it didn't last long. We are at about 2,100' above sea level here, about 1,000' higher than the ...

-
They poured the basement floor on the 22nd. We ordered a colored concrete for the garage floor. That was poured the following Fri...