Tuesday, October 16, 2018

Some Progress


Well let's see, what's new since last I posted?   They poured the lower level walls.










And sprayed them with water-proofing.


And did some preliminary grading.




Then the plumbers came and did the in-ground drain plumbing.







If all goes well the Inspector will pass the work and the concrete lower level floor will be poured this week.  Then comes the framing!

So far we have been happy with the builder.  Especially the foreman Matt.  He keeps us up to date and very much in the loop.  Has listened to our concerns and communicated well with the subs.  My engineer husband really appreciates that :)

No comments:

Post a Comment

First Snow

It was pretty but it didn't last long.   We are at about 2,100' above sea level here, about 1,000' higher than the "...