Tuesday, September 17, 2019
Almost There
The floor protection has been removed and the floors have been swept.
All the contractors have removed their miscellaneous stuff. It's almost ready for some furniture.
More cleaning needs to be done but it's pretty close to being done.
Landscaping will be minimal and will start with some native trees.
Oh and we had a visitor...
Subscribe to:
Post Comments (Atom)
First Snow
It was pretty but it didn't last long. We are at about 2,100' above sea level here, about 1,000' higher than the ...
-
Insulation was completed last week. Drywall will begin this week. ELPH tells me it's about 90 days after drywall that we shou...
-
Things are coming along very well. The framers are 99.9% complete and the plumber has started. Electrician will start in about a week. ...
Wow! What a beautiful place! Stunning and open feeling. I love the floors. Loved seeing the bobcat. Apparently they are still in our neck of the woods also. I caught one on my trail camera last winter.
ReplyDelete