Tuesday, January 29, 2019

Ready for Inspection



This view is standing in the kitchen looking towards living room/back of the house.


 From the sliders towards the kitchen & living room.  The power in the floor in the kitchen is where a big eating island will be with the cook-top. The Oven/Microwave, dishwasher, sink and refrigerator will be along the wall. 





















From the picture window looking at the fireplace and foyer/front door. TV and bookcases will be on the wall to the left of the fireplace. The room to the far left with the window sitting on the floor is the Master Bedroom.

So, the HVAC, Electrical and Plumbing rough-ins are complete.  And as you can see the Shingles are on.  County Inspection should be this week Friday.

Next up Insulation & Sheetrock!

No comments:

Post a Comment

First Snow

It was pretty but it didn't last long.   We are at about 2,100' above sea level here, about 1,000' higher than the ...